Our team takes safety seriously and has an on staff director with OSHA 500 credentials. SEC enforces PPE, safe driving, Job Hazard Analysis, Heat/Cold weather management and other safety measures to ensure a safe working environment for its Employees and other contractors.
Our team has over a decade of experience in the Solar field. Our team has installed over 2 Gigawatts of Solar across the United States in various weather and soil conditions. SEC installs foundation
piles, racking systems and Solar modules and has worked on projects ranging from 5 MW to 300 MW. SEC can install piles in rocky soil with the
Our team has over a decade of experience in the Solar field. Our team has installed over 2 Gigawatts of Solar across the United States in various weather and soil conditions. SEC installs foundation
piles, racking systems and Solar modules and has worked on projects ranging from 5 MW to 300 MW. SEC can install piles in rocky soil with the use of a patented “side drilling” technique where piles are driven to refusal and then drilled through the web of the piles to break up obstructions allowing piles to be driven to embedment depth. This technique saves time,
does not require extraction of piles and significantly decreases cost under rocky soil conditions.
SEC utilizes primarily utilizes a fleet of Turchi 300F pile driving machines equipped with 1060 joule hammers. We maintain these machines with our inhouse mechanics. SEC also owns and operates Mazaka 1200 machines with 1450 joule
hammers for harder ground conditions. Additionally, we operate a fleet of 15 pile driving machines and schedules spare
machines on every job to prevent downtime.
Copyright © 2023 SEC - All Rights Reserved.
Powered by GoDaddy Website Builder
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.